Great service from WS & Sons Roofing Contractors. They fixed our leaking valley, replaced rotten battens, and re-cemented the ridge tiles. Good communication, fair price, and quality work.

New roof in Brighton, stripped to the rafters and guaranteed for 25 years
- Competitive, fair pricing
- Written quotations
- No obligation
- Free roof inspections
Get a free quote
Tell us what the roof is doing. William comes out and gives you a free written quote.
A new roof in Brighton from WS & Sons starts with the old one coming off completely, back to the rafters. Ring 01273 110909 or send the form and William will come out, look at the roof and give you a free quote.
Patching a roof that has reached the end of its life costs more every winter. The nails and battens holding the tiles rust and rot, the old felt underneath turns brittle and splits, and once water gets past a slipped tile it runs straight onto the timbers. When the repairs keep coming back, a full re-roof is the cheaper answer over the next 30 years.
Our re-roofs are the whole job, not an overlay. The old tiles, battens and felt come off and go in the skip. With the roof open we check every rafter, purlin and wall plate and replace anything rotten. Then a breathable membrane goes on, new treated battens are set out to the gauge of the new tile, and the roof is covered in the tile or slate you choose. The ridge, hips and verges are finished with dry fix systems, so there is no mortar left to crack and wash into the gutter.
The 1930s semis and hipped bungalows across Brighton, Hove and the Sussex coast are the roofs we replace most. Sharon put it plainly in her October 2026 review of the re-roof on her 1930s semi: four days from start to finish. Most of the photos on this page are those jobs, taken on the day, including the stages a customer never sees under the tiles.
What is included
- Scaffold, skip and full strip of the old tiles, battens and felt
- Rafters, purlins and wall plates checked, rotten timber replaced
- New breathable roofing membrane, lapped and fixed
- New treated battens set out to the gauge of your tile
- Concrete interlocking, plain, slate-effect tiles or natural slate
- New lead to valleys, abutments and the chimney
- Dry ridge, dry hip and dry verge systems
- Gutters cleared and the site left clean every day
Signs you need this
- The same leak coming back after more than one repair
- Tiles slipping into the gutter every winter
- Felt in the loft torn, sagging or crumbling
- A dip along the ridge or waves across the slopes
- Daylight showing through from inside the loft
New roofs: our recent work
Every photo is one of our own jobs. Tap to enlarge.
Hip roof stripped to the rafters with old battens showing
New membrane and treated battens on a hip, flyer in shot
Tiles going on over blue membrane, flyer in shot
Dark tiles being laid up a hip roof, flyer in shot
Red tile re-roof finished, WS & Sons flyer held in shot
Grey dry hip and ridge junction on a new tile roof
Old weathered tile roof and chimney beside a slope of solar panels
Roof slope stripped to the rafters beside solar panels, roofer on the scaffold
Roofers fixing battens over blue membrane up to the ridge and chimney
New battens set out over green membrane, old tiles stacked at the foot
How it works
Free survey
William looks at the roof and the loft, talks you through tile choices and gives you a written quote.
Scaffold and strip
Scaffold up, the old roof off and skipped, every timber checked while it is open.
Membrane, battens, tiles
New membrane and battens, tiled from the eaves up, new lead at every junction.
Dry ridge and clear-up
Dry ridge and verge fitted, gutters cleared, scaffold down, 25-year guarantee handed over.
Every re-roof carries our 25-year guarantee, in writing. William quotes the job himself and is on the roof while it is done.
Building the layers of your new roof
Measure the junctions
We record the pitch, eaves level and adjoining roofs before stripping. This sets the tile gauge and leaves room for sound flashing details.
Expose the structure
The covering comes off in controlled sections. We check bearing points and timber connections as well as the visible faces of the rafters.
Prepare drainage and airflow
Eaves support carries the membrane into the gutter. Ventilation paths stay clear of insulation, with the underlay fitted to its specification.
Batten and cover
Graded roofing battens are set out for the chosen covering. Tiles are laid in aligned courses and secured to the roof's fixing specification.
Close the roof edges
Valleys and wall flashings are completed before the final ridge fittings. We check cut tiles, gutter discharge and the ends of each dry fix run.
Planning the strip and the weather window
The size of the roof opening matters as much as the size of the house. We plan the strip so exposed sections can be protected before work stops. Dormers, several hips and shared roof junctions add fitting time. Scaffold installation, material deliveries and removal are separate stages around the roofing work. Your programme also allows for checking hidden timber before the new layers cover it, with changes explained while the structure is visible.
Choosing the whole roof specification
Concrete interlocking tiles cover broad slopes with fewer individual pieces than plain tiles. Clay plain tiles give smaller courses and a different texture, but require more setting out around hips and valleys. Natural slate has its own fixing and lap requirements. Weight, pitch and exposure decide which options belong on the shortlist. A colour sample alone does not establish suitability. We compare the covering with the supporting structure and the neighbouring roof before agreeing the specification.
Reusing sound tiles preserves an older roof's appearance, but sorting and matching them adds labour. New tiles give a consistent supply for the whole slope. Either choice still needs the layers underneath to work together. The membrane, ventilation openings, eaves support and ridge system must suit the finished assembly. Where the roof meets an older adjoining house, we explain the joining detail rather than leave that edge to be decided during tiling. Our tiled roofing page explains covering details.
What goes into a re-roof price
A useful re-roof quote describes the hidden layers as clearly as the visible tiles. Compare the scope as well as the total.
- Measured slope area and roof pitch
- Scaffold layout and protection below
- Chosen covering and salvaging existing materials
- Number of hips, valleys and dormers
- Timber repairs exposed during stripping
- Insulation, ventilation and adjoining roof details
Read the new roof cost guide alongside your written specification. The surveyed roof determines your quote.
Looking after a newly covered roof
Keep the handover photographs and material details with your written guarantee. Check from the ground for displaced fittings after rough weather, and arrange gutter clearing when debris builds up. Loft storage must leave the eaves airflow clear. Tell anyone fitting aerials or other equipment where the new roof details are, so their work does not obstruct drainage or disturb the covering. Contact us about a change before attempting a roof repair yourself.
New roofs: your questions answered
How long does a re-roof take?
A three-bedroom semi takes around four to five days on the roof once the scaffold is up. Larger detached houses, natural slate and roofs with dormers take longer. You get the start date and the expected finish with your quote.
Do I need planning permission for a new roof?
Replacing a roof like for like on a house does not need planning permission. Conservation areas, listed buildings and flats can be different, and Brighton has a lot of conservation areas, so we check with you before anything is booked.
What if you find rotten timber once the tiles are off?
We show you, with photos, and price the extra timber before we fit it. Rafters and battens hidden under 80 years of tiles are the one thing no roofer can price from the ground.
Which tile should I choose?
Most Brighton semis suit concrete interlocking or plain tiles. Terraces in conservation areas often need natural slate or a close match to the original. We bring samples and tell you which one suits the house and the budget.
What does the 25-year guarantee cover?
Our workmanship on the new roof for 25 years from the day we finish. Tiles, membrane and dry fix systems also carry their manufacturers' guarantees.
Will you clear up?
Yes. The skip goes, the gutters are emptied and the garden is swept. Customers mention the clean-up in review after review.
Can I stay at home during a re-roof?
The work is carried out from outside, with noise and movement overhead. We agree access around doors and the garden before stripping starts. Move fragile items away from the loft work area and tell us about rooms that need particular protection.
Does new underlay remove the need for roof ventilation?
Underlay choice and ventilation are considered together. A breathable membrane does not justify blocking eaves openings with insulation. We check the roof build-up and specify airflow details to suit the covering and the space below.
Related services
What customers say on Google
Thanks to William and his team we now have a completely new flat felt roof, with a 15 year guarentee. No mess was left, and they were very quick getting the job done in about 5 hours!
Ws & sons done a fantastic job on replacing my guttering & soffits they also replaced my old cement verge to a dry verge system it looks fantastic all done in 2 days left my property like new very clean & tidy
William came around same day to take a look at my leak on my flat roof… and the team were in place in a couple days. Really happy with the work, as well as the clean up
Thanks to WS & sons roofing contractors for replacing our old flat roof. He supplied all new timber, all new torch on felt, put on a new dry ridge kit system and also replace some tiles. He’s done a fantastic job! Highly recommend and will use again.
Thank you to ws&sons roofing contractors Ltd for doing such a great job on replacing my roof William landed on time done a great job price was great never delayed time Highly recommend.
Thank you to William and his team from ws & sons roofing Contractors the team done a fantastic job on replacing all new ridges and installed a new dry ridge system. He also cleaned the moss off. The tiles cleaned out all of the guttering and removed all the green mould. Job was done. All in two days. Fair price and I highly recommend. I will be definitely using them again thanks guys
Prompt flat roof build with a window installation. Looks great, very neat and tidy. Polite and considerate guys. Hasn't rained yet but am sure it will hold up well. Thank you and recommend to future clients.
Thank you Ws & sons roofing excellent service, we had a leak in the loft and the guys were there following day to replace felt and few tiles, all good now many thanks! would highly recommend
roof
guarantee
Every re-roof and flat roof guaranteed for 25 years, in writing
When we re-roof your house or lay a new flat roof, our workmanship is guaranteed for 25 years from the day we finish, and the membrane, tiles, slates and flat roof systems carry their manufacturers' guarantees on top. All our work is guaranteed, and we are fully insured, with £1 million public liability cover.
Covered
- Our workmanship on re-roofs and flat roofs for 25 years
- Lead, flashings, ridges and verges we fit
- Flat roofs laid to the system's specification
- Repairs, with the terms on your quote
On top
- Tile and slate manufacturer guarantees
- Membrane and flat roof system guarantees
- Photos of the finished job
- William on the end of the phone if anything is wrong
Not covered
- Storm or accidental damage after completion
- Work altered or added by someone else
- Parts of the roof we did not work on
- Gutters left to block and overflow
The guarantee for your job is written on your quote before you agree to anything. Read the full guarantee.
Talk to us about new roofs
Ring or send the form. William comes out, looks at the roof, shows you what is needed and gives you a free written quote, with no obligation.



